Based in U.S. Currency
Use the Weld vs. In-Die Cost Calculator below to determine the potential cost savings gained by using PROFIL® In-Die Fasteners for your next program.

PROGRAM

WELD PROCESS

FASTENER

$

Weld vs In-Die Fastener
Cost Comparison Model

Savings
Per Nut
Per Bracket
Annual
Remaining Life of Program
Adjust results by entering new values below
Process Pedestal Weld Cell Installation
(Weld Nuts)
Life of Program (years)
Bracket Volume Per Year
Nuts Per Bracket
Nut Volume Per Year
Years In Production
Brackets Per Stroke/Cycle
Cycle Time (seconds/bracket)
Machine Speed (SPM/CPM)
Throughput @ 90% (brackets/hr)
Hours Per Shift
Work Days Per Year
Work Hours Per Year (1 Shift)
Shifts Required
Cost Element Quantity Cost/Each Total Cost/Nut
Nut $
Capital $
Tooling $
Cell Floor Space - Sq. Foot $
Direct Labor Per Hour $
Operating Expense Per Hour $
Indirect Labor Per Hour $
Subtotal
SG&A %
Markups %
Total
Process In-Die Installation
(PROFIL NUTS)
Life of Program
Bracket Volume Per Year
Nuts Per Bracket
Nut Volume Per Year
Years In Production
Brackets Per Stroke/Cycle
Cycle Time (seconds/bracket)
Machine Speed (SPM/CPM)
Throughput @ 90% (brackets/hr)
Hours Per Shift
Work Days Per Year
Work Hours Per Year (1 Shift)
Shifts Required
Cost Element Quantity Cost/Each Total Cost/ Nut
Nut
Capital $
Tooling
Cell Floor Space - Sq. Foot
Direct Labor Per Hour
Operating Expense Per Hour
Indirect Labor Per Hour
Subtotal
SG&A %
Markups
Total
Optional: For Informational Purposes Only

PANEL P/N

FASTENER P/N

DATE P/N

Review Results with a Technical Expert